Basic Information
Model NO.
Cement Floor Cracks Repair Glue
Chemical Properties
Moisture Resistant
Product Name
Concrete Pavement Expansion Joint Sealant
Color
Black/White/Cement Grey
Product Description
Aluminum Foil Bag Packing Cracks Repair Potting Glue
Concrete Pavement Expansion Joint Sealant
Product Application
🔔 Important Usage Notes:
- Use as soon as possible after opening to avoid curing.
- Winter curing time may be longer; keep away from water until fully cured.
- Keep out of reach of children. Wash skin immediately upon contact.
- Store in a cool, dry place (5-25°C, humidity <50%RH).
Product Parameters & Dosage
| Gap Depth \ Width |
2mm |
3mm |
5mm |
10mm |
20mm |
| 2mm depth |
125 m |
83 m |
50 m |
25 m |
12.5 m |
| 10mm depth |
25 m |
16.5 m |
10 m |
5 m |
2.5 m |
Packaging & Shipping
Company Profile
Our enterprise is a one-stop service provider integrating R&D, design, production, and installation. We specialize in advanced construction materials and prefabricated structures. With ISO9001:2015 certification and over 30 national patents, we ensure the highest standards in the industry.
Frequently Asked Questions
What is the primary use of this sealant?
It is designed for repairing cement floor cracks and sealing concrete pavement expansion joints to provide moisture resistance and flexibility.
How long does it take to cure?
The standard curing time is between 24 and 48 hours, depending on the ambient temperature and humidity.
Is the sealant resistant to weather changes?
Yes, once fully cured, it is moisture-resistant and flexible, allowing it to withstand expansion and contraction in various weather conditions.
What is the shelf life of the product?
The product has a shelf life of 3 years when stored in a cool, dry place in its original sealed packaging.
Can I request customized packaging?
Yes, we provide various specifications including 200g, 500g, 1kg, 5kg, and 10kg, and we also offer customized OEM/ODM options.
How do you ensure product quality before shipment?
We follow strict QC procedures where each batch is tested multiple times using professional machinery to ensure performance consistency.